Tabar Project | Mapimi Project | Monakoff Project | Mandilla Project | Red Dam Project

RED DAM PROJECT

The Red Dam gold project is located near Coolgardie, Western Australia and is comprised of P16/1577 and P16/1578, and applications for M16/344 and P16/2078. The tenements cover a contiguous area of approximately 300ha. The project is located in a structural corridor containing current gold resources exceeding 5Moz. Deposits in this zone include Kundana, White Foil, Frogs Leg, the ABC Line, Mungari East and Carbine.

On 27 July 2004 Allied entered into an Option Agreement with Siberia Mining Corporation Ltd for the sale of the Red Dam gold project for a consideration of between $950,000 and $1,000,000. At the Option expiry date of 26 July 2005 the Option had not been exercised.


Reverse Circulation Drilling

During the period from 19 April to 3 May 2004, a total of 2,229 metres of inclined RC drilling was completed in 16 drillholes ranging in depth from 100 metres to 176 metres at the Petrus gold prospect.

Petrus forms part of the Company’s Red Dam gold project which is located approximately 50km north-west of Kalgoorlie in Western Australia in a structural corridor containing gold resources exceeding 5 million ounces. Deposits in this zone which lie within 30 km of Red Dam include Kundana, White Foil, Frogs Legs, the ABC line, Mungari East and Carbine.

The aim of the drilling programme was to provide further information on the continuity and grade of gold mineralisation over the 500 metre long NNW-SSE trending Petrus prospect.

As a result of the interpretation of assay results and geological information gained from the drilling programme, four parallel zones of gold mineralisation within a corridor approximately 100 metres in width were confirmed.

The Central Dolerite Lode has been shown to extend over a strike length of at least 350 metres and the Hangingwall Lode extends for at least 500 metres along strike. The Hangingwall Lode has been demonstrated by previous drilling to extend to a depth of at least 300 metres.

The most significant drilling results are tabulated below.

SectionHoleNorthing
(mN local
grid)
Easting
(mE local
grid)
Dip/azimuth
(mag)
Interval
(m)
Intersection
(m @ g/t Au)
25,650RDRC5525,6506,295-60°/225°50-55
80-81
5 @ 14.8
1 @ 1.65
25,650RDRC5625,6506,325-60°/225°34-39
58-59
141-145
5 @ 5.98
1 @ 1.90
4 @ 1.30
25,700RDRC57



RDRC58
25,700



25,700
6,290



6,315
-60°/225°
inlcuding
including

-60°/225°
73-103
75-79
87-92

71-72
107-113
128-130
30 @ 1.98
4 @ 4.17
5 @ 3.36

1 @ 4.14
6 @ 2.95
2 @ 1.30
25,750RDRC5925,7506,340-60°/225°46-51
64-65
5 @ 5.27
1 @ 1.98
25,850RDRC6025,8506,338-60°/225°60-63
127-129
130-132
134-137
140-142
3 @ 14.6
2 @ 1.17
2 @ 2.88
3 @ 4.14
2 @ 1.58
25,900RDRC45






RDRC46
25,902






25,900
6,294






6,345
-60°/225°






-60°/225°
48-53
55-56
59-61
83-84
108-110
127-129

74-76
102-107
123-125
127-133
137-138
5 @ 4.64
1 @ 6.14
2 @ 1.46
1 @ 1.08
2 @ 1.54
2 @ 12.3

2 @ 1.45
5 @ 3.10
2 @ 15.4
6 @ 2.64
1 @ 24.6

NB: Samples assayed by aqua regia digest with an AAS finish. Intervals based on norminal 1 glt Au cut-off.






 
Projects
 
RC Drilling - Petrus Gold Project
Allied Gold Homepage
Company Profile
Projects
Investor Relations
Company Announcements
Aim Rule 26
Photo Gallery
Media Relations
Video
Constitution
Corporate Governance
Contact Us